Airport Baggage-Handling System Obstruction Analysis - Case Study

Progression of images from Photo of the site, to Scan of the Site, to overlay of the new design onto scan data (from left to right).


Overlay of the design drawings on the scan as-built. Over 40 obstructions and misalignments were found within this project. These design challenges would not have been addressed until the equipment was manufactured and ready to install. At which time, the cost to correct these problems more than doubles.


Detail of an HVAC system that was believed to be in the way of a new conveyor. Coordination of potential problems can now be resolved at the beginning of the project rather than during.

 

Fast Facts-G&T BHS

Date: 2005
Client: G&T Conveyor Co.
Scope: Scan of a baggage-handling system and surrounding bag-room for as-builts
HDS Project Facts
Duration: 40 Field Hrs.
80 CAD Hrs.
Size: 30,000 sq. ft.
Crew: 1 Field
1 Office
Deliverables:
  • 2D Plan, Elevation, Section through entire site
  • Obstruction Report identifying problems
  • 3D Models
  • Animations for proposals and team communication
If Done Conventionally
Duration: 160 Field hrs.
80 Office hrs.
Crew: 3 Field
1 Office
Deliverables:
  • 2D Drawings
  • Level of detail not attainable through conventional means